Gun-line charges put energy into a truck through a cable instead of swapping the battery, so they never pass the connector validation the rest of the pipeline relies on — every one needs a human verdict. Status is evidence (did a booking form match?); decision is intent (should it be billed?). They are separate on purpose: a session can be auto-verified and still rejected.
What the decision does: the corrected export includes a gun-line session only when it is accepted and released. Rejected and undecided sessions are both left out — so rejecting is not what keeps energy out of billing, accepting is what lets it in. Nothing is deleted either way: every decision records who made it, when, and any reason given, and it can be changed later.
By month — pick a month to work through. A month with nothing awaiting a decision is done.
| Month | Sessions | kWh | Awaiting decision | Need VIN | Accepted | Rejected | Released | Telemetry | Zero kWh | |
|---|---|---|---|---|---|---|---|---|---|---|
| Loading… | ||||||||||